MA’ADEN ALUMINUM MINE SERVICE FACILITY

Design, details engineering, fabrication, supply, construction, and commissioning of Mine Services Facility with a total area of 214,562.00m2 that will include a heavy equipment workshop, administration building, a heavy equipment refueling bay, a light equipment refueling bay, diesel storage tanks, heavy & light equipment was-down bay, heavy equipment water fill station, lubrication farm, industrial gas storage area, industrial air filter cleaning station and associated access roads.

CLIENT
MA'ADEN
LOCATION
BUAITHA, KSA
FACTS & FIGURES
The workshop has a total of 10 heavy equipment bays with total area of 6000m2, inclusive of a Tire Bay and Boilermaker/Welding Bay. The range of equipment to service and repair are 100t trucks, 80t tracks dozers, 16H grader, blast drills, auxiliary equipment and range of excavators up to 300t. Included in the workshop is also one overhead Gantry Crane that is 30t-10t dual hook. The fuel storage tanks can hold up to 20,000,000 Liters per year.